Device - Capacity

74hc00 Circuit

About

Any device / program has a certain capacity for transmitting/computing information, often measured by:

Management

Planning

The process of predicting a future load is called capacity planning. Ie how much capacity I need to sustain a future load.





Discover More
Card Puncher Data Processing
Computer - Capacity Planning (Sizing)

Capacity planning is the process of predicting a future system load in order to to determine the type of hardware required for a software. Capacity = the number of agents (m) = the number of parallel...
Card Puncher Data Processing
Computer - Channel

A channel is a device that conveys a digital bit stream, from: one or several senders (or transmitters) to one or several receivers. The term channel has two different meanings the whole medium...
Performance Capacity
Performance - Capacity x Load x Time Visualization

The operational characteristics are determined by: capacity: the number of agents (m) load: the utilization of the agents (ρ) performance: the time you spend in the system (R) The...



Share this page:
Follow us:
Task Runner